Dava, Maulana and Putranesia, Thaha (2025) Analisa Perhitungan Biaya Pekerjaan Elektrikal dan Elektronik Pada Proyek Pembangunan Alix Residence Blok A - Jalan Dutamas Raya, Segambut Mukim Batu, Wilayah Persekutuan, Kuala Lumpur, Malaysia. Diploma thesis, Universitas Bung Hatta.
![I.pdf [thumbnail of I.pdf]](http://repository.bunghatta.ac.id/style/images/fileicons/text.png)
I.pdf
Download (16MB)
![II.pdf [thumbnail of II.pdf]](http://repository.bunghatta.ac.id/style/images/fileicons/text.png)
II.pdf
Download (271kB)
![INTERNSHIP REPORT_DAVA MAULANA_2210015410046.pdf [thumbnail of INTERNSHIP REPORT_DAVA MAULANA_2210015410046.pdf]](http://repository.bunghatta.ac.id/style/images/fileicons/text.png)
INTERNSHIP REPORT_DAVA MAULANA_2210015410046.pdf
Download (90MB)
Abstract
This report summarizes internship activities conducted at PKT Quantity Surveying
Consultant Sdn. Bhd., Kuala Lumpur, over 95 days (28 April - 31 July 2025),
focusing on the quantification and administration of construction costs. The scope
of work included: measurement of structural quantities for the BPNT4 Shop Office
project (staircase rebar, coping, ground beam/slab excavation, RC plinth tank, and
TNB CSS upstand beam), preparation of tender documents (Pre-Qualification,
Appendix D List of Drawings), BIM-based modeling and takeoff (CostX, Glodon
TAS/TRB/TBQ), and contract administration tasks (Interim Valuation, Variation
Order, and RFVA). In addition, Chapter IV presents a case study analyzing the
electrical and electronic works of Alix Residence Block A, encompassing Levels 1
to 11, located at Jalan Dutamas Raya, Segambut, Federal Territory of Kuala
Lumpur (WPKL). The methodology involved quantity measurement from
AutoCAD shop drawings and unit rate analysis, producing a Bill of Quantities (BQ)
amounting to RM 1.382.679,57. The largest cost components were Lighting Small
Power (64,27%) and Cable Routing (25,85%), which were subsequently integrated
into a time schedule based on percentage of cost and duration. The internship
enhanced accuracy in cost estimation, strengthened the technical administrative
connection, improved audit readiness of cost documents, and reinforced the
application of BIM 5D in Quantity Surveying practice.
Keywords: Internship, Quantity Surveying, BIM 5D, cost analysis, electrical works,
Alix Residence
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik Sipil dan Perencanaan > Ekonomi Kontruksi |
Depositing User: | QS FTSP |
Date Deposited: | 19 Sep 2025 01:36 |
Last Modified: | 19 Sep 2025 01:36 |
URI: | http://repository.bunghatta.ac.id/id/eprint/775 |